Worley have urgent potential opportunities for an exciting project on renewables battery factory complex in Sweden.
We require the services of the below engineers to work on the integrated design and construction of laboratory and testing facilities for a major renewables client.
The Scope will include basic engineering, detail design phases through to construction with an anticipated duration for initial phase of 6-9 months.
Following disciplines are required:
Process Engineers and Designers
Electrical Engineers and Designers
HVAC Engineers
Technical Safety Engineers
Structural Engineers
Civil and Architectural Engineers
Piping Engineers and Designers
Control and Instrumentation Engineers and Designers
Experience and knowledge of onshore construction regulations, building layout, utilities, and steel frame construction required.
